Carolyn Wong, PMP Schedules4u@gmail.com 714-758-5018 PROJECT
CONTROLS Using my twelve
years of experience in Project Controls and Project Management, I would like
to provide quality project planning, scheduling, and cost control to help
increase my employer’s market competitiveness and operational
effectiveness. Because of my exposure to various business environments,
challenges and solutions, I would be able to contribute immediately and
ensure business processes are developed and implemented for effective adoption
of the Primavera P6 tool. Planning &
Scheduling Skills ·
Senior level
Planning & Scheduling skills using Primavera P6. Super User of
Primavera P6. ·
Performed
functional implementation of Primavera P6 software application by providing
oversight on the purchase and installation; Co-authored an easy to understand
user manual, and setup application user accounts on both the client side and
the cloud intranet (My Primavera) ·
Provided
Primavera user training online, in a class room setting and one to one basis. ·
Used Oracle
Primavera P6 to build baseline schedules, integrated project schedules and
master integrated milestone schedules. Largest schedule developed &
maintained had 8000 plus activities. ·
Authored
Schedule Narrative for Baseline Schedules and Updated Schedules to ensure
understanding of Schedule Contents, Critical Path, Gantt Charts, Project
Issues, Recovery Plans, Schedule Forecast and Project Look Ahead Plans. ·
Developed
various schedule reports such as Critical Path, Predecessor & Successor,
and 3 week Look Ahead. Group and sorted by WBS, Resource and
Departments. ·
Developed
WBS, OBS, EPS and Universal/Enterprise Code System for all Project Schedules. ·
Managed the
scope, budget and schedules for large and small construction projects with
Piping & and other associated Mechanical Fluid Handling equipment.
Other construction projects included HVAC, DI, Water and Waste Water, Bulk
Gas, and Large Tank Vessels. PROJECT TYPES Engineering & Construction Electrical
Substations, Transmission & Distribution Oil & GasPublic School Building
Improvements Business Process ImprovementNew School Gym
Construction Lean Six SigmaUltrapure Water Wastewater & Industrial WaterHVAC,
Cooling Towers & VOC Treatment Exhaust Environmental Clean-Ups EDUCATION/TRAINING/CERTIFICATIONS: •
Primavera
P6 Professional Rel. 8.2 Fundamentals & Advanced (April 23, 2014) •
Bachelor
of Science, Chemical Engineering, University of Illinois at Chicago, 1996
•
PMP
Certification, Project Management Institute, July 2006 to present •
Lean
Six Sigma Black Belt, CMS Consulting, 2012 COMPUTER SKILLS Project Management Software Applications •Oracle Primavera P6 release 5.0, 6.0, 6.2,
6.8, 7.0 •P6 Web Access (formerly known as
“Primavera’s Web application” or “myPrimavera”) •Primavera Project Planner (P3) 3.1 •MS Project 2010 in a MS Project Server
environment. •AtTask in a web based environment. Other Commercial Software Applications •Oracle People Soft – Financials •Mercury – Project Funding Approvals •MS Office 365, MS Office 2013: Sharepoint,
OneNote, Powerpoint, Word, Excel, Visio PAST KEY
ACCOMPLISHMENTS ·
Informational
and requirements gathering to develop an improved Project Management and
Project Controls program for the Capital Projects and Engineering department.
·
Proposed
recommended improvements of the Procure to Pay business process. ·
Develop a
Project Portfolio Report from several data sources across several nationwide
regions to enable prioritization and program management decisions by the
Executive Management and Steering Committee. ·
Developed and
implemented the first baseline schedule for Project Development Engineers to
minimize impact to Construction. ·
Improved
integration of workflow between department silos by creating and implementing
the use of a Master Project Schedule Template that mapped all group processes
and interdepartmental handoffs. ·
Performed
functional implementation of Primavera P6 software application by providing
oversight on the purchase and installation. ·
Configured P6
Web Access accounts (dashboards, portfolios) and applied various user
security settings. ·
Provided P6
Web access training and Co-authored a condensed user manual for P6 Web
Access. · Investigated the feasibility of integrating Global SAP and
Cost Account systems with Oracle Primavera P6 · Developed and implemented a maintenance and operations
program for the start-up and maintenance of the ultrapure water piping
distribution system to prevent biofilm damage and piping distribution
capacity shortages. At least $500K to $1Million Capital money was
saved. · Performed feasibility studies and determined return of
investment of a chemical injection device to save about 20% on chemical cost
and usage. Obtained management approval managed the construction
installation of this chemical injection system. PROFESSIONAL
EXPERIENCE Contract Project Controls Consultant, ATS/IAG, October
2013 to Present · Gathered workflow information from Capital, Accounting and
Procurement to produce business process flowcharts and diagrams of all
business processes and recommended improved future state for construction
execution, procure to pay and invoice processing workflows. · Authored procedures for Construction execution such as
RFI, Change Orders, Schedule Specifications, and Construction Management
operations. · Lead the implementation of the Construction Management
program and interfaced with Construction Contractors to request, refine and
review Construction Control Reports such as Schedules, Cost Reports and Labor
Productivity Reports. · Authored business case and obtained upper management
support for the Oracle P6 EPPM tool to enable the implementation of a
companywide integrated Project Controls Scheduling program between Capital
Projects and Maintenance Turnarounds. Gathered quotes, IT security and
infrastructure information and service level agreements from the P6
implementation suppliers. · Authored the business case study
and gap analysis for the general accounting versus job costing tools, roles
and processes for a proper Project Controls Cost program. Independent Consultant, dBA Strategic Biz
Systems, Orange County CA, 2008 to Present ·
Consulted small businesses and
start-ups on operations and Project Management methods and tools. ·
Identified,
improved and resolved inefficiency in business operations through development
and documentation of existing and new business procedures and workflow
diagrams. ·
Created a web based business
operations manual linking all written procedures and work flow diagrams with
employee job descriptions. Benefit to the small business was consistent
results in their products and services, minimize employee learning curves, and
improve employee productivity. Contract Project Controls Consultant, Lewis &
Fowler, Denver, Colorado, 2013 Project: DCP Midstream, Houston, TX ·
Developed the Project Portfolio
Report from several data sources and project lists of several regions to
enable prioritization and program management by the Executive Steering
Committee. ·
Used MS Project 2010 Enterprise
Server to create and update project schedules and project status reports. ·
Manage, assign and train team
members and project managers on creating financial and project status reports
using MS Project Enterprise Server and Excel pivot tables. Assisted
with financial forecasting and analysis, cost report production and
distribution. ·
Work with supply chain on issuing
purchase orders and material tracking. ·
Monitor and ensure the progress of
capital project AFD to AFE funding status using Mercury Contract Senior Scheduler, EPCM-psi, Inc. Long
Beach, CA, 2012 Project: Shell Canada, Fort Saskatchewan,
Canada ·
Developed an
integrated Project Management and Project Controls program to ensure
repeatable and consistent schedule and cost performance for Capital Projects
and Project Development. ·
Improved
integration of workflow between department silos by creating and implementing
the use of a Master Project Schedule Template that mapped all group processes
and interdepartmental handoffs. ·
Determined
the feasibility of integrating Global SAP and Cost Account systems with Oracle
Primavera P6. ·
Created and
implemented the first baseline schedule for Project Development Engineering
to minimize impact to Construction and prevent excess float consumption. ·
Analyzed and
recommended improvements to the Estimating workflow. ·
Developed the
first earned value productivity reports for Construction & Engineering. Contract Project Controls Engineer, Aerotek
Engineering, Ontario, CA, 2009 to 2010 Project: SCE Electrical Transmission &
Distribution, Green Energy/Windmill, Ontario, CA ·
Used Oracle Primavera P6 to build
baseline schedules, integrated project schedules and Master integrated
schedules for $1.5 Billion electrical substations and transmission power
lines. ·
Authored weekly project schedule
narratives discussing schedule forecasts, issues, critical path and recovery
plans. ·
Performed QA/QC on schedule logic,
applied universal codes and developed baseline schedules. ·
Assisted with labor hour estimates
and cost reports as needed. ·
Trained junior schedulers and new
senior scheduler. Contract Senior
Project Controls Engineer, CDM, Irvine, CA, 2008 to 2009 Project: Lockheed
Martin Environmental Clean Up – Soil & Water, Western and Pacific
Northwest Region ·
Performed
functional implementation of Primavera P6 software application by providing
oversight on the purchase and installation. ·
Configured P6
Web Access accounts (dashboards, portfolios) and applied various user
security settings. ·
Provided P6
Web access training and Co-authored a condensed user manual for P6 Web
Access. ·
Developed
baseline schedules and monthly update schedules for all project phases and
activities of legal, regulatory agency, permits, engineering, procurement
& construction. ·
Managed a
Master Integrated Schedule with linkage to individual project schedules
within the enterprise server. Performed QA/QC of the schedule logic
network. ·
Presented and
distributed the schedule weekly forecast, critical finish dates and
milestones. ·
Trained Junior
Schedulers and provided P6 Web Access training. ·
Held virtual
online meetings with team members located nationwide for schedule updates,
schedule presentations, project team meetings and P6 Web Access training. Contract Senior Project Controls Engineer, Global Business
Solutions, Costa Mesa, CA, 2006 to 2008 Project: Southern
California Edison – $205 Million new substation, $50 Million new Transmission
Route, SVC & RAS projects. Other projects included 66kV & 220kV
transmission line relocations, GIS Construction & Well Relocation. ·
Used Oracle Primavera P6 to
Develop baseline schedules and updates to level 4 project schedules for new
electrical substation construction & relay upgrades to existing
electrical substations. ·
Phases included engineering,
procurement, construction, testing, in-service, outage and closeout phases. ·
Reviewed & integrated Gas
Insulated Vendor (GIS) contractor schedule to ensure they met the SCE Master
Schedule requirements and to determine the critical path. ·
Produced what-if schedules to
forecast finish dates of other substation locations to prepare for cut-ins
and new substation energize date. Project: Los
Angeles Unified School District Project ·
Used Primavera P5 and P6 to
maintain 335 master program schedules worth $811 Million for design and
construction in a region for School Improvement Projects ·
Provide Senior Scheduling project controls
support to LAUSD School improvements, New Gym Construction, ADA compliance
and Fire Alarm projects. ·
Trained Project Managers on
operation of in-house application to update their milestone schedule. ·
Developed a what-if integrated CPM
schedule and adhoc schedules on request. ·
Review and approve contractor
baseline and monthly update submittal schedules. ·
Assist with the negotiation of
change orders backed by the schedule. ·
Produced Time Impact Analysis
(TIA) from the owner’s perspective in response to contractor change order
requests. Contract Project
Controls Scheduler/Engineer, KDG Consulting, Los Angeles, CA,
2005 to 2006 Project: Los
Angeles Metropolitan Water District, Oxidation Reduction Project, Los
Angeles, CA ·
Use Primavera Enterprise 4.1 and
5.0 to maintain & build resource and cost loaded schedules. ·
Prepare project performance status
reports on a bi-weekly, monthly and quarterly basis ·
Oversight and delivery of project
control functions for cost, schedule, change control, and document control. ·
Analyzed and resolved budget and
expenditure variances, analyzed man-hour estimates, contractor cash flow and
estimated FTE resource need. Contract Project Controls Scheduler, Volt/Sun Technical,
2005 Project: Southern California Edison
San Onofre Nuclear Generating Station, San Onofre, CA via ·
Developed and
managed schedules using Primavera 4.1 for various Small Capital &
Sustaining Projects and software installation of ERIP, a Facilities Equipment
status and maintenance history software application. ·
Produced a
forecast schedule showing unacceptable finish dates for ERIP software
installation leading to project managers accelerating work. Contract Project Controls Scheduler, The
Industrial Company, Bakersfield, CA 2005 Project: Shea Homes PUD Accommodation on
Brea-Olinda Oil Fields, Brea, CA Provided scheduling and planning support
using Primavera P3 for a $1.5 Million capital project to replace an existing
Oil Field Pumping System to allow residential PUD construction above
hydraulic pumps, pipes and associated fluid handling equipment. ·
Supported the development and
management of an 8000+ activity baseline schedule using construction design
drawings and project scope documents. ·
Produced schedule reports showing
the critical path and forecast finish for client approval. Contract Project Manager, Aerotek
Engineering, South San Francisco, 2003 Project: STI Machine Services machine
safeguarding, ALZA & Genentech, Bay Area Northern California ·
Managed the design, procurement
and construction for safeguarding manufacturing machines at ALZA and
Genentech. ·
Responded to RFPs, wrote proposals
and negotiated with the client on quotes and change orders. ·
Developed the first project budget
reports with the database administrator to enable monitoring of project
budgets, change orders and project cost performance. Contract Field Project Manager, Kinetic Systems
Inc., San Francisco Bay Area & Fremont, CA, 2002 Projects:
Applied Materials (AMAT), Intel, Bayer, Genentech, AMD, LAM Research, Chiron,
Berlex, and Dey Labs. ·
Field Project Manager for various
satellite locations throughout the San Francisco Bay Area. Managed
projects for design, isometric pipe drawings, procurement and construction of
specialty process piping and associated fluid handling equipment, high purity
water, gas and air systems for biopharmaceutical and microelectronics
manufacturing equipment installation. ·
Biopharmaceutical projects
included fermentation tanks and associated fluid handling equipment such as
piping, valves and pumps with budgets of $500k to $2 Million. ·
QA/QC pipe
fabrication and welding, managed the scope and budget. ·
Produced cost
reports, budget forecasts, estimate capital contingency release, and called
clients for payment collection to improve cash flow. ·
Wrote project
proposals and quotes. Tracked RFQ and RFI and construction documents in
Access. ·
Built a
piping line number database to track pipe fabrication and installation
completion. ·
Oversight to
isometric drawings for pipe fabrication. Coordinated client review of
isometric drawings. Chemical Engineer/Project Manager, Intel Corporation,
Facilities & Construction, Hillsboro, OR, 1997 to 2001 ·
Chemical Engineer owner of the
following facility systems: Ultrapure Water and DI Water Systems, Chemical
Treatment, Wastewater Treatment & Collection Systems, and HVAC Systems
such as air handlers, process cooling water, VOC removal systems and solvent
exhaust system. ·
Lead five project teams for
design, construction and installation of semiconductor manufacturing
equipment for Defect Metrology, Thin Films Metrology, SORT, Globals
(cleanroom furnishings), and Support. Total budget was about $2 million. ·
Managed the scope and cost for
construction work of DI water and wastewater treatment systems that ranged
from $10,000 to $300 million. ·
Managed external contractors from
Construction, Architectural and Engineering firms. ·
Member of worldwide Joint
Engineering Team (JET) for process and operational improvement of DI water
and wastewater treatment systems. Wrote and sponsored white papers for
water and wastewater treatment process improvement. ·
Ensured capital construction
followed corporate engineering design specifications. ·
Member of a Corporate Joint
Engineering Team (JET) member to improve equipment reliability and pass down
lessons learned in the design, construction and operation of DI water and
wastewater treatment systems. Professional Organizations ·
Member,
Project Management Institute, Houston, 2013 ·
Member,
AACEI, Houston Chapter, 2013 ·
Project
Manager, Business Process Management, Project Management Institute, Orange
County, 2006 to 2013 ·
Board
Secretary, AACEI Southern California, 2008-2009 Page 1 of 6 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|